# Utilization rate

> Utilization rate measures the share of capacity actually consumed, based on logged time, on productive (project) or billable activities.

- HTML: https://www.simpleworkload.com/en/glossary/utilization-rate
- Markdown: https://www.simpleworkload.com/en/glossary/utilization-rate.md

## What is Utilization rate?

Utilization rate measures the share of capacity actually consumed, based on logged time, on productive (project) or billable activities.

## Key points

Unlike allocation rate, which is forward-looking, utilization is observed from timesheets.

Comparing allocation and utilization reveals gaps between plan and reality and feeds planned-vs-actual metrics.

## Formula

Utilization rate = actual time logged on projects ÷ available capacity × 100

## Example

12 days logged on projects against 16 days of capacity = 75% utilization.

## Sitemap

- [Markdown sitemap](https://www.simpleworkload.com/sitemap.md)
- [XML sitemap](https://www.simpleworkload.com/sitemap.xml)
- [llms.txt](https://www.simpleworkload.com/llms.txt)
- [llms-full.txt](https://www.simpleworkload.com/llms-full.txt)
