Why does an IT PMO need Workload?

Because compiling slides is not a trade-off job. Workload prepares the Capacity Committee: overloads, movable Soft/Tentative work, assignment scoring, plan vs timesheet. You challenge demand; the CIO decides — you are no longer the committee clerk.

For IT PMOs
Prepare the trade-off. Stop compiling.

Your value is decision quality — not Sunday-night PowerPoint.

Transfers proposed, never imposed.Proposed moves · 18 d to transfer · Nothing moves without the CIO's sign-off.Proposed movesSelect allSoft surplus on Cloud Migration → uncovered need on IT SecurityPDPierre DuboisCloud MigrationIT Security10 dSoftload unchangedSBSophie BernardCloud MigrationIT Security8 dSoftload unchangedTotal18 d to transferConfirm 2 transfersTicking saves a draft. Only confirming changes the planning.Before → AfterNeed coverage per projectBeforeAfterIT Securityneed 35 d+18 dBefore12 d · 34%After30 d · 86%Cloud Migrationneed 42 d−18 dBefore60 d · 143%After42 d · 100%surplus 18 dDotted line: 100% of the needNothing moves without the CIO's sign-off.Proposals stay as drafts until you confirm them.Workload
Transfers proposed, never imposed.

Frequently Asked Questions

Does Workload replace Jira for the PMO?+

No. Jira stays for execution. Workload is the capacity and trade-off prep layer. Tempo sync available by plan.

How do we save reporting time?+

Capacity and conflict views replace much of the manual consolidation. Committee packs start from live data, not a frozen export.

Link to the resource allocation tool?+

Hard/Soft/Tentative allocation is your daily lever; the Capacity Committee is the ritual. See IT resource allocation.

Can we coexist with an existing PPM?+

Yes: PPM for heavy governance if needed; Workload for operational capacity and the weekly ritual. See Workload vs PPM.

Where to start in week one?+

Import teams/projects, lock critical Hard allocations, list >100% people, run a first 30-minute Capacity Committee.

What about Monday / Asana on the business side?+

Business teams can keep their execution tool. The PMO consolidates capacity in Workload for cross-team trade-offs.

Prepare a Capacity Committee without Excel — free trial

Start for free