How do you estimate an IT project and connect it to capacity planning?
IT project estimation turns a scope into person-days and budget. Without net capacity (leave, run, other projects), the figure stays theoretical. Workload does not replace WBS, PERT or Planning Poker — those methods live in the estimation guide. It takes the estimated demand, compares it with real capacity, allocations and budget simulations, and flags overload above 100 %. The trial lasts 14 days; the Starter plan starts at €59/month (€49/month billed annually, 20 planned people included).
IT project workload estimation
tied to capacity planning
Move from a person-day estimate to a real workload plan: net capacity, allocations, forecasts and budget in one tool. 14-day trial or a demo on request.
Frequently Asked Questions
What is IT project estimation?+
It is the exercise that turns an IT scope into effort (person-days) and budget. Methods such as WBS, PERT, Planning Poker, function points and historical ratios are covered in the project estimation and workload planning guide. An estimate becomes actionable when it is compared with actual team availability.
How is that different from IT capacity planning?+
Estimation answers “how much effort does this project take?”. Capacity planning answers “do we have the capacity, now and in the coming months, to carry this portfolio?”. The workload plan turns that answer into a week-by-week view. Workload covers capacity planning and the workload plan; the guide covers estimation methods.
What is the best capacity planning tool for an IT department?+
It depends on the context (in-house IT, professional services, full PPM). For an IT department that needs a workload plan and capacity planning, compare the public scoring grid on our best capacity planning tools page. Workload is built for in-house IT: capacity, allocations, forecasts and budget simulations — not professional-services billing or a stand-alone project Gantt. 14-day trial, from €59/month.
Does Workload calculate WBS, PERT or Planning Poker?+
No. Those methods stay in the estimation guide. The product takes estimated demand (manual entry or CSV import), compares it with net capacity, offers a forecast wizard and comparisons, and supports budget simulations.
How do you go from a person-day estimate to a workload plan?+
You enter or import projects and planned effort, allocate people without going past 100 %, review multi-project conflicts, and adjust with forecasts and budget. The IT team workload plan and IT resource allocation pages describe the operating rhythm.
How can I see a demo or start a trial?+
The trial lasts 14 days, with no credit card, from the sign-up page. For a guided walkthrough, request a demo. The Starter plan starts at €59/month (€49/month billed annually, 20 planned people included). Workload bills per planned person (active team members, employees or contractors, with at least one assignment in the period), not per login account.