How do you build an IT team workload plan?

An IT team workload plan crosses net capacity (after leave, run, training) with project demand. Centralize allocations, cap at 100%, detect multi-project conflicts, and arbitrate in committee. Workload replaces the shared spreadsheet: net capacity, overload alerts, linked timesheet — for IT orgs of 20–500, from $59/month.

IT team workload plan
without a shared spreadsheet

The IT workload plan is no longer a frozen spreadsheet: net capacity, visible conflicts, and PMO arbitration in one tool.

See overload before it blocks your projects.5.5 d overloaded · 4 people above capacity · 7 d availableCapacity vs loadWeek 43 · Oct 19 · Platform team · 8 membersWeekMonthYearLoadOverloadAvailableCapacity 100%LoaddaysMMMarie Martin140%7 / 5 dPDPierre Dubois130%6.5 / 5 dEREmma Rousseau130%6.5 / 5 dLPLucas Petit110%5.5 / 5 dCDCamille Durand100%5 / 5 dSBSophie Bernard60%3 / 5 dJMJulie Moreau60%3 / 5 dNBNicolas Blanc40%2 / 5 d5.5 d overloaded4 people above capacityRebalance7 d availableto absorb this week's overloadWorkload
See overload before it blocks your projects.

Frequently Asked Questions

What is an IT team workload plan?+

It is the view that crosses who is available (net capacity) with committed work (projects, run, leave). CIOs and PMOs use it to decide go / defer without overloading teams.

How is it different from IT capacity planning?+

Capacity planning answers “can we take this portfolio?”. The workload plan operationalizes that answer week by week (allocations, conflicts, committee). Workload covers both — see IT capacity planning.

Can Excel hold an IT workload plan?+

Up to ~15 people and few projects, yes. Beyond that, version conflicts and manual consolidation explode. See Excel capacity plan alternative.

How does the PMO use the workload plan?+

To allocate Hard/Soft/Tentative, prepare the capacity committee, and justify hiring. See PMO resource allocation tool.

Should the workload plan link to timesheets?+

Yes, to compare plan vs actual. Workload syncs Jira Tempo, Azure DevOps, Toggl, or Clockify depending on plan.

Where to start if we only have Excel today?+

Import CSV (teams, projects, allocations), see who is over 100%, then run a 30-minute committee. 14-day trial, no credit card.

Does the plan cover run and build?+

Yes. Splitting run/build avoids believing project capacity remains when support consumes 60–70% of time.

What ROI when leaving an Excel capacity plan?+

For an 80-person IT org, year-1 TCO gap vs a dedicated tool often exceeds $50k. Model your case on the ROI calculator.