What is the best resource management software for IT teams?

The best resource management software for an IT team depends on what you need to manage. On our weighted six-criteria grid for internal IT teams of 20 to 500 people, Workload (88/100), Runn (73/100), Jira Tempo (69/100) score highest. Teams already living in Jira lean toward Tempo; teams that need heavyweight enterprise portfolio governance lean toward a PPM suite instead. Below you will also find a sourced fact table (public vendor docs, dated) and selection criteria for CIOs and IT PMOs. This ranking is not independent: Workload publishes one of the tools, and the full method, weights, and limits are shown on the page.

Best resource management software for IT teams

A buyer guide for CIOs and IT PMOs: sourced comparison table, selection criteria, scored ranking, and how to choose.

Last updated :

Resource management software compared: sourced facts

Workload versus tools covered by our comparison pages. Every cell cites a public source with a consultation date; unverified cells are marked “—”. Tool names link to the detailed Workload vs pages where available.

Factual comparison of capacity and resource tools, with sources and consultation dates
ToolCategoryOverload visibilityPlanned vs actualCapacity modelPlan or pricingSourcesConsulted on
WorkloadIT capacity planning (system of record)Native detection of allocation conflicts across projectsYes: time synced from Jira Tempo, Azure DevOps, Toggl, Clockify, or CSVNet capacity per team and skill (leave, run work deducted)Public pricing from €59/month; time integrations from the Professional plan
Jira Tempo (Capacity Planner + Timesheets)Planning and time tracking in JiraTeam availability shown in one view to limit overbookingYes: Planned vs Actual report, which requires both Timesheets and PlannerHours, within the Jira ecosystemTwo apps to combine
Jira Plans (Advanced Roadmaps)Multi-team delivery planning in JiraSprint capacity management view—Not assessedStory points or hours per iteration; requires boards as work sourcesSee Atlassian documentation for included plans
RunnResource planningLets you check whether someone is overbooked, by how much, and whyBuilt-in actuals tracking and integrations (Harvest, Clockify, Workflow Max)Capacity and utilization metrics by week, month, and quarter—Not assessed
FloatVisual resource schedulingOverallocation flagged in the scheduleYes: “Logged vs. Scheduled” reportScheduled time per personTime tracking limited to the Pro and Enterprise plans
Smartsheet (Resource Management)Work management with a resource moduleWorkload, availability, and overallocation views across projects—Not assessedRole-based planning and staffing—Not assessed
Microsoft ProjectProject schedulingOverallocation shown in red, with a leveling indicator—Not assessedResource calendar and availability settings—Not assessed
PlanviewEnterprise PPMVisualization of constraints and adjustment of overallocations—Not assessedCapacity and utilization per resource and period—Not assessed
TriskellPPM for mid-size and large companiesIdentification of bottlenecks and periods of underuse—Not assessedDemand, resource, and capacity management, with scenarios and simulationsQuote-based pricing
Monday.comGeneral-purpose Work OSWorkload view: overload in red, available capacity in green—Not assessedAssigned tasks per person on the calendarWorkload view limited to Pro and Enterprise plans
Asana (Workload)Work managementRed line when assigned work exceeds weekly capacity—Not assessedEffort in hours, points, or percent; weekly capacity per person—Not assessed
Microsoft PlannerTask and plan management (Microsoft 365)—Not assessed—Not assessedPeople view from Planner Plan 1; Assignments view and team workload with Plan 3 / Plan 5Basic plans with a qualifying Microsoft 365 license; premium subscriptions Plan 1 and Plan 3

Scores by criterion

RankToolScore /100IT capacity focusWeight 25Conflict detectionWeight 20Timesheet and planned vs actualWeight 15Rollout timeWeight 15Cost and pricing transparencyWeight 10Team adoptionWeight 15
1Workload885/54/54/55/54/54/5
2Runn733/54/54/54/53/54/5
3Jira Tempo693/53/54/54/53/54/5
4Float642/53/53/54/53/55/5
5Smartsheet612/53/53/54/53/54/5
6Excel / Google Sheets572/51/51/55/55/55/5
7Planisware573/54/54/52/51/52/5
8Planview573/54/54/52/51/52/5
9Sciforma573/54/54/52/51/52/5
10Microsoft Project522/53/52/53/53/53/5
  • 1. Workload — 88/100

    Strengths : Built for internal IT capacity; native conflicts and planned vs actual; setup in about 30 minutes.

    Limits : Not an enterprise PPM (multi-BU financial governance); timesheet integrations from the Professional plan.

  • 2. Runn — 73/100

    Strengths : Modern resource planning: overallocation alerts, planned vs actual on every plan, time imported through integrations (Jira, Clockify, Harvest).

    Limits : Services and agency oriented; little IT-department framing (run work, steering committee).

    Detailed comparison →
  • 3. Jira Tempo — 69/100

    Strengths : Reference for time tracking in Jira; with Capacity Planner, a planned vs actual report and team availability view (paid Tempo modules).

    Limits : Several modules to combine; view centered on the Jira ecosystem, so capacity beyond Jira (run, leave, skills) is less covered.

    Detailed comparison →
  • 4. Float — 64/100

    Strengths : Very easy-to-adopt visual schedule, leave included; time tracking with a scheduled vs logged report.

    Limits : Designed for agencies; no IT capacity governance or import of time from engineering tools.

    Detailed comparison →
  • 5. Smartsheet — 61/100

    Strengths : Highly flexible, familiar to spreadsheet-minded teams; resource module with availability and overallocation views.

    Limits : Not built for IT capacity: skills, run work, and portfolio arbitration must be modeled yourself.

    Detailed comparison →
  • 6. Excel / Google Sheets — 57/100

    Strengths : Available immediately, near-zero cost, total flexibility.

    Limits : No conflict control; fragile formulas and multiple versions beyond 20–30 people.

    Detailed comparison →
  • 7. Planisware — 57/100

    Strengths : Robust PPM suite for large development and investment portfolios.

    Limits : Significant rollout project; quote-based pricing.

    Detailed comparison →
  • 8. Planview — 57/100

    Strengths : Very broad enterprise PPM coverage, advanced governance and reporting.

    Limits : Heavy rollout and administration; quote-based pricing.

    Detailed comparison →
  • 9. Sciforma — 57/100

    Strengths : Multi-BU PPM with mature resource and portfolio management.

    Limits : Multi-month rollout project; quote-based pricing.

    Detailed comparison →
  • 10. Microsoft Project — 52/100

    Strengths : Proven project scheduling, well integrated into the Microsoft ecosystem.

    Limits : Project-centric rather than aggregated team capacity.

    Detailed comparison →

Ranking methodology

Last reviewed :

Profile assessed

  • Internal IT department or IT PMO of 20 to 500 people
  • 10 to 60 concurrent projects sharing the same teams
  • Need for net capacity (leave, run work, skills) and committee trade-offs
  • Teams already using Jira, Azure DevOps, or spreadsheets

Criteria and weights

IT capacity focusWeight : 25/100Scale : 5: built for aggregated IT team capacity · 3: general resource planning that can be adapted · 1: other use case (project Gantt, billing)
Conflict detectionWeight : 20/100Scale : 5: native multi-project overload and double-booking alerts · 3: limited or per-project alerts · 1: you build it yourself
Timesheet and planned vs actualWeight : 15/100Scale : 5: native actuals or actuals from engineering tools (Jira, Azure DevOps), compared with the plan, with no extra paid module · 4: same, with a higher plan or an extra paid module · 3: time tracking compared with the plan, but entered separately · 1: none
Rollout timeWeight : 15/100Scale : 5: first useful trade-offs in under a day · 3: a few weeks · 1: multi-month project
Cost and pricing transparencyWeight : 10/100Scale : 5: public pricing within reach of an IT team · 3: public per-user pricing · 1: quote-only, consulting likely
Team adoptionWeight : 15/100Scale : 5: usable without heavy training · 3: short training needed · 1: dedicated administration required

How the score is computed

Score = Σ (criterion weight × rating ÷ 5), giving a total out of 100. Each rating runs from 0 to 5 according to the criterion's scale.

Ratings are whole numbers. Ties are broken alphabetically.

Sources and date

Ratings are based on vendors' public documentation (websites, pricing pages, product docs) and demos, cross-checked on the review date. No confidential data is used.

Transparency: conflict of interest

Workload publishes one of the tools evaluated. Ratings are Workload's editorial assessment, not an independent audit. The grid is defined for the profile above: with another profile, the ranking changes.

Limits of the method

  • Ratings reflect one specific profile; a large multi-BU enterprise would weigh things differently.
  • Offerings change: check features and pricing on vendors' websites.
  • A rating is not proof of performance: test 2 or 3 tools on your own data.

Spotted an error or an update? Write to us through the contact page.

Resource management or capacity planning: which do you need?

In US usage, resource management software usually means tools that assign people to work and show who is available, overbooked, or on the bench. Capacity planning looks one level up: do we have enough total people-hours for the portfolio over the next quarters? Most IT teams need both, which is why many tools in this category blur the line.

Capacity planning answers “can we take this work?” Resource planning / resource management answers “who does it this week?” Workload is the CIO-layer tool: capacity, allocation, timesheet — not a day-to-day resource scheduler for agencies.

Selection criteria for resource management software in IT

  • Net capacity: leave, holidays, and run work deducted, not just a headcount number.
  • Conflict detection across projects, so overbooking shows up before it delays delivery.
  • Skills: the ability to find and assign by skill, not only by name.
  • Actuals: time pulled from Jira, Azure DevOps, or your time tracker, compared with the plan.
  • Scenarios: a way to test “what if this project moves?” without touching the live plan.
  • Fit with your ecosystem: SSO, Jira, Azure DevOps, ITSM, and CSV import.
  • Pricing transparency: public plans versus quote-only enterprise suites, and which features sit behind higher tiers.

How to choose by situation

  • Fewer than about 20 people: a spreadsheet may still be enough.
  • A Jira-centric team: a Jira-native option keeps planning next to the issues, but check coverage of run work and non-Jira projects.
  • An agency-style or services team: look at resource scheduling tools built for billable utilization.
  • A large enterprise needing financial and demand governance: a PPM suite, with a dedicated team to administer it.
  • An internal IT team of 20 to 500 people that mainly needs capacity, conflicts, and planned versus actual: a capacity-focused tool is usually faster to adopt.

Common pricing models

Most tools charge per user or per resource per month; PPM suites are usually quoted. Check which features sit behind higher plans (time tracking and reporting are common examples) and whether a module is sold separately. The sourced table above only states public plan notes when a vendor documents them; otherwise the cell is marked as not assessed.

FAQ

Is this ranking independent?

No. Workload publishes one of the tools. The scored ranking is our editorial assessment from public documentation, with the weights, scale, and limits shown on the page. The factual comparison table cites a public source and consultation date on every row; unverified cells are marked “—”.

What is the difference between resource management and capacity planning?

Resource management assigns specific people to work. Capacity planning compares total available people-hours with total demand. Most IT teams need both. See also the French capacity ranking at /fr/meilleur-outil-capacity-planning.

Which tool is best for a small IT team?

For a small team, prioritize fast setup and simple pricing. Below roughly 20 people a spreadsheet can still work; beyond that, a dedicated tool pays off once people are shared across projects.

Is Workload resource management software?

Not in the agency or staffing sense. Workload is IT capacity planning for CIO and PMO teams: net capacity, portfolio allocation, timesheet, and reporting. Day-to-day “who works on what this week” is handled as allocation, not as a creative-studio scheduler.

Does resource management software replace Jira?

No. Jira holds the work items. Resource management software holds who is available and assigned, and compares that with demand.

Where are the detailed Workload vs comparisons?

Each tool name in the sourced table and scored ranking links to a dedicated comparison page when one exists (for example Workload vs Float, vs Runn, vs Tempo, vs Planview). You can also open the full comparison hub from the section below.

Go further

See your team's real capacity

Import your teams and projects as CSV and see capacity and overload in half an hour.

14-day free trial